D3 mould square bar
D3 mould steel double tempering is recommended. Tempering should be done with the least possible delay after hardening, preferably when the tools are still hand warm. Select a suitable tempering temperature, bearing in mind the service requirements. Heat slowly and uniformly. When the component has reached the desired temperature, soak for at least one hour per 25mm of thickness. The second tempering should be a repetition of the first.

Product Basic Information:
D3 mould steel chemical composition &mechanical properties:
Chemical Composition:
| Grade | C | Mn | P | S | Si | Cr |
D3 | 2.00-2.35 | 0.60 max | 0.030max | 0.030max | 0.60 max | 11.00–13.50 |
Equivalent Steel Grade
| DIN | ASTM | GB | EN / ISO | JIS | BS |
1.2080 | D3 | Cr12 | X210Cr12 | SKD1 | BD3 |

D3 mould square bar Heat Treatment:
FORGING: Pre-heat at 900-950°C then raise temperature to 1050-1100°C. Soak until uniformly heated. D3 tool steel is relatively hard at elevated temperature. Therefore, initial hammer blows must be light and the temperature must not be allowed to fall below 1020°C until the metal begins to flow. Final forging should not be done below 900°C.
ANNEALING: 1.2080 tool steel is supplied in the annealed and machineable condition. Re-annealing will only be necessary if the steel has been forged or hardened by the toolmaker. To anneal, heat slowly and uniformly to 900°C. Soak for three to four hours and allow to cool in the furnace to room temperature. Re-heat to 800-1040°C and again soak for three to four hours. Allow to cool in the furnace to room temperature.

Packing & Delivery
Packing Details : Export standard package,bundled or be required.
The inner size of container is below:
20ft GP: 5.8m(length) x 2.13m(width) x 2.18m(high)
40ft GP: 11.8m(length) x 2.13m(width) x 2.18m(high)
40ft HG: 11.8m(length) x 2.13m(width) x 2.72m(high)
Delivery Details : 7-15 days,or according to the order quantity or upon negotiation
| Package | With strips, wooden pallets, standard export package or as required |
Lead Time | 7-10 days after get deposit |
Payment Terms | T/T, L/C |
Price Terms | FOB, CRF, CIF, EXW |

FAQ
1.Could the steel be customized for us?
Yes.We are the professional manufacturer which has rich experience in Precision Seamless Steel Sheet manufacturing.We could print the logo and label under your requirments if you need OEM product.Besides this ,we will do some refined processes like CNC cutting,chamfering galvanization and tapping.If you have detailed spec or drawing our production lead time is within 30-45 days.
2.What is your terms or delivery?
We accept EXW,FOB,CIF,DDU etc.You can choose the one which is the most convenient or cost effective for you.

Our Service

Hot Tags: d3 mould square bar, China, manufacturers, suppliers, factory, D2 Mould Steel Bar, a2 steel heat treating, h13 steel properties, 1 2344 Steel Bar, K110 Steel Bar, 1 2714 tool steel



