Products
4Cr5MoSiV1/1.2344/SKD61/H13 Die/Tool Steel Round Bar

4Cr5MoSiV1/1.2344/SKD61/H13 Die/Tool Steel Round Bar

D3 mould steel double tempering is recommended. Tempering should be done with the least possible delay after hardening, preferably when the tools are still hand warm. Select a suitable tempering temperature, bearing in mind the service requirements.
Send Inquiry
Chat Now

Our firm aims to operating faithfully, serving to all of our shoppers, and working in new technology and new machine regularly for plastic mould steel material, 52100 Bearing Steel Wire, Titanium Net Tube. If you need good service and quality, pls choose us, thanks! The company adheres to the principle of user-centered and integrity management, and dedicated pre-sales, in-sales, and after-sales services to satisfy our clients.

D3 mould square bar

D3 mould steel double tempering is recommended. Tempering should be done with the least possible delay after hardening, preferably when the tools are still hand warm. Select a suitable tempering temperature, bearing in mind the service requirements. Heat slowly and uniformly. When the component has reached the desired temperature, soak for at least one hour per 25mm of thickness. The second tempering should be a repetition of the first.

Applications


Product Basic Information:

D3 mould steel chemical composition &mechanical properties:

Chemical Composition:

Grade

C

Mn

P

S

Si

Cr

D3

2.00-2.35

0.60 max

0.030max

0.030max

0.60 max

11.00–13.50

Equivalent Steel Grade

DIN

ASTM

GB

EN / ISO

JIS

BS

1.2080

D3

Cr12

X210Cr12

SKD1

BD3


product


D3 mould square bar Heat Treatment:

FORGING: Pre-heat at 900-950°C then raise temperature to 1050-1100°C. Soak until uniformly heated. D3 tool steel is relatively hard at elevated temperature. Therefore, initial hammer blows must be light and the temperature must not be allowed to fall below 1020°C until the metal begins to flow. Final forging should not be done below 900°C.

ANNEALING: 1.2080 tool steel is supplied in the annealed and machineable condition. Re-annealing will only be necessary if the steel has been forged or hardened by the toolmaker. To anneal, heat slowly and uniformly to 900°C. Soak for three to four hours and allow to cool in the furnace to room temperature. Re-heat to 800-1040°C and again soak for three to four hours. Allow to cool in the furnace to room temperature.

Product details


Packing & Delivery

Packing Details : Export standard package,bundled or be required.

The inner size of container is below:

20ft GP: 5.8m(length) x 2.13m(width) x 2.18m(high)

40ft GP: 11.8m(length) x 2.13m(width) x 2.18m(high)

40ft HG: 11.8m(length) x 2.13m(width) x 2.72m(high)

Delivery Details : 7-15 days,or according to the order quantity or upon negotiation

Package

With strips, wooden pallets, standard export package or as required

Lead Time

7-10 days after get deposit

Payment Terms

T/T, L/C

Price Terms

FOB, CRF, CIF, EXW


Packing


FAQ

1.Could the steel be customized for us?

Yes.We are the professional manufacturer which has rich experience in Precision Seamless Steel Sheet manufacturing.We could print the logo and label under your requirments if you need OEM product.Besides this ,we will do some refined processes like CNC cutting,chamfering galvanization and tapping.If you have detailed spec or drawing our production lead time is within 30-45 days.

2.What is your terms or delivery?

We accept EXW,FOB,CIF,DDU etc.You can choose the one which is the most convenient or cost effective for you.

CONTACT US


Our Service


We are capable of manufacturing and supplying 4Cr5MoSiV1/1.2344/SKD61/H13 Die/Tool Steel Round Bar. We emphasis on customer services and our employees are always ready to serve our customers in their best efforts and commitments. We insist on honesty and trustworthiness as the foundation of enterprise development, allowing you to buy reliable products at a preferential price and in a fast way. Pioneering and innovation is the soul of enterprise development. Therefore, we realize all-staff innovation through extensive communication activities and reasonable staff suggestions.

Send Inquiry